Pile Cage Making Machine
Model: ZHL-1500
Cage Diameter: 300-1500mm
Cage Length: Customized(≥12m)
Cage Weight: Max 4000kg
Main Frame Bar Diameter: φ12-32mm
Coil Bar Diameter: φ6-12mm
Coil Bar Distance: 50-400mm
Welding Way: Manual Welding, Robot Welding
Voltage: 380V 50HZ
Power: 13-30KW
Pile Cage Making Machine Overview
PLC-controlled Pile Cage Making Machine automates rebar cage production with precision and efficiency, replacing manual labor to deliver faster, more consistent results for large-scale infrastructure projects like bridges and high-speed rail construction.
Technical Parameters
| Parameter | ZHL-1500 | ZHL-2000-12 |
|---|---|---|
| Cage Specifications | ||
| Cage Diameter | 300–1500 mm (11.8–59.1 in) |
600–2000 mm (23.6–78.7 in) |
| Cage Length | Customized (≥12m/≥39.4ft) | |
| Max Cage Weight | 4500 kg (9,921 lbs) |
6000 kg (13,228 lbs) |
| Bar Specifications | ||
| Main Frame Bar Diameter | φ12–32 mm (φ0.47–1.26 in) |
|
| Coil Bar Diameter | φ6–16 mm (φ0.24–0.63 in) |
φ6–12 mm (φ0.24–0.47 in) |
| Coil Bar Distance | 50–400 mm (2.0–15.7 in) |
|
| Welding & Power | ||
| Welding Method | Carbon-dioxide arc welding | |
| Voltage | 380V 50Hz/Customized | |
| Power | 13 kW (17.4 HP) | 23 kW (30.8 HP) |
Machine Work Principle
-
Rebar Loading: The operator inserts the main reinforcement bars into precision-aligned holes on both fixed and rotating disks.
-
Spiral Welding: Coiled wrap reinforcement is automatically welded to the main rebars while the disks rotate, creating perfect spiral formation.
-
Quality Assurance: The PLC-controlled system maintains:
-
Exact stirrup spacing (±2mm tolerance)
-
Consistent cage diameter throughout production
-
Continuous weld quality meeting ISO 1461/BS 4449 standards
-
-
Autonomous Operation: The closed-loop system requires only initial setup, then runs uninterrupted with real-time monitoring.
Key Features
High-Speed Production Capacity
• Achieves daily output of 20+ fully welded 12m cages
• Requires only 10 workers across two shifts (70% fewer than manual methods)
• Delivers 3x faster completion versus traditional fabrication
Precision Engineering
• CNC-controlled automation ensures:
-
±1.5mm spacing accuracy between spirals
-
Diameter consistency within 0.5% tolerance
-
Automatic real-time quality verification
• Eliminates 90% of manual QC inspections
Cost Optimization
• 1.5% material savings through optimized:
-
Rebar utilization
-
Zero overlapping stirrups
-
Minimal scrap generation
• 60% labor cost reduction versus manual cage assembly
Efficient Site Integration
• Standardized cage ends enable:
-
-
Rapid interlocking of multiple units
-
50% faster hoisting operations
-
Simplified on-site assembly
• Compatible with all common lifting equipment
-